We have developed Dredgers for carrying out desilting of intake channel and pre cooling channels of Thermal Power Plants. We have carried out following works
Dredging in Cooling Water intake channel at Dahanu Thermal Power Station of Adani Group for eight years since Dec 2018
Dredging in Pre cooling channel at Dahanu thermal Power station of Adani Group since Aug 2019
Dewatering of Cooling Water Intake Channel during Shut down at DTPS, Dahanu for ten years since Dec 2018
Removal of clinker next to the Jetty for Ultra Tech Cements Ltd, Surat
Laying of 1.2 km submarine HDPE pipeline at Mukka, Mangalore for Mangalore SEZ